Commercial · Condominiums · HOAs · Apartments

EV charging for communities

Owners in Virginia, Maryland and DC can now request chargers in their own parking spaces. We help boards answer those requests safely and plan shared charging the whole community can use.

Request an EV readiness review

Capacity review

What the building can support today

Owner and shared charging

Assigned spaces and common lots

Permits and utility

Coordinated for the association

2-year warranty

Minimum, on commercial workmanship

When it is time to plan for EV charging

Right-to-charge laws mean requests will keep coming. Boards that plan once avoid deciding case by case.

EV charging station

Owner requests arriving

Each request raises the same questions about wiring, metering, insurance and cost. A plan answers them once.

Aerial view of a parking lot

Parking lot or garage work planned

Paving or garage repairs are the cheapest time to add conduit for future chargers.

Electrical panel

Limited electrical capacity

Older services may not support many chargers without load management or upgrades.

Mid-rise brick apartment buildings

Residents and buyers asking

Charging is becoming an amenity buyers and renters look for.

See how it is built

Take the assembly apart layer by layer. Select a layer to see what it does and what we check on a survey.

Before and after

Drag the handle to compare.

Aerial view of a parking lot Vehicle charging in a parking garage BeforeAfter
[Replace with before-and-after photos from a BuildWise project.]

What we cover

Readiness review

  • Electrical capacity assessment
  • Charger layout options
  • Load management options
  • Budget by phase

Owner requests

  • Review of owner applications
  • Installation to association requirements
  • Separate metering or billing options
  • Insurance and documentation

Shared charging

  • Common-area chargers
  • Signage and striping
  • Access and payment options
  • Accessible charging spaces

Electrical work

  • Panel and service upgrades
  • Conduit and trenching
  • Wiring and circuits
  • Utility coordination

Garages and lots

  • Wall-mounted and pedestal chargers
  • Concrete bases and bollards
  • Patching and restriping
  • Lighting near chargers

Closeout

  • Testing and commissioning
  • Permits closed out
  • Owner and board documentation
  • Photo record

How an EV charging project runs

Select a stage to see what happens, what the board does and what residents notice.

Readiness review

What happens

We review the electrical service, parking layout and any existing requests.

The board's part

Shares the governing documents, parking assignments and requests received.

What residents notice

Nothing; work is in electrical rooms and parking areas.

Plan and options

What happens

Options for owner chargers, shared chargers or both, with capacity limits and costs.

The board's part

Chooses the approach and any rules for owner installations, with the association's attorney.

What residents notice

Nothing yet.

Permits and schedule

What happens

Permits, utility coordination and equipment orders.

The board's part

Approves the plan and schedule.

What residents notice

Written notice two weeks before work, with any parking changes.

Installation

What happens

Electrical work, chargers, bases, signage and striping, section by section.

The board's part

Updates as sections are completed.

What residents notice

Affected parking spaces closed only during their work.

Closeout

What happens

Testing, inspection sign-off and documentation for the board and owners.

The board's part

Receives the closeout file and charger documentation.

What residents notice

Chargers ready for use.

Questions boards ask

Can an owner require us to allow a charger?

Virginia, Maryland and DC all have right-to-charge laws that limit how far associations can restrict owner chargers in their own spaces, while letting the board set reasonable conditions. The association's attorney should confirm what applies to your community.

Who pays for an owner's charger?

Generally the owner, under conditions the association sets. We can price installations to the association's requirements.

Does our building have enough power?

The readiness review answers this. Many buildings can add some chargers now and more with load management or service upgrades.

Should we install shared chargers?

Shared chargers serve residents without assigned spaces and can be a fair alternative to many individual installations.

Can conduit be added during other projects?

Yes. Adding conduit during paving or garage repair costs far less than trenching later.

Start with an EV readiness review.

Tell us about the parking and any requests you have received. We review capacity and come back with options the board can decide on.