Commercial · Condominiums · HOAs · Apartments

Site, parking and paving

Parking lots, sidewalks, striping, drainage, fencing and lighting: the grounds residents and visitors use every day. We plan every phase around cars and foot traffic so the community stays open.

Request a site survey

Written site report

Photos and marked-up site plan

Parking plan

Agreed with management in advance

Phased by lot section

Never the whole lot at once

2-year warranty

Minimum, on commercial workmanship

Signs the grounds need work

Site problems get worse fast once water gets in. These are the conditions we map on a survey.

Aerial view of a parking lot

Faded striping

Stalls, fire lanes and accessible spaces residents cannot see are a safety and enforcement problem.

Mid-rise brick apartment buildings

Cracks and potholes

Open cracks let water into the base. Seal them early and you avoid rebuilding the lot.

Garden-style brick condominium building

Trip hazards

Raised and broken sidewalk panels are one of the most common liability claims for associations.

Wet pavement

Standing water

Puddles that stay for days point to failed drainage or settled pavement.

See how it is built

Take the assembly apart layer by layer. Select a layer to see what it does and what we check on a survey.

Before and after

Drag the handle to compare.

Retaining wall under construction at a condominium community Completed retaining wall with new planting bed at a condominium building BeforeAfter
Retaining wall rebuilt at a condominium community: during construction and finished, with a new planting bed.

What we cover

Asphalt

  • Crack sealing
  • Sealcoating
  • Patching and full-depth repair
  • Mill and overlay

Striping and signage

  • Parking layout and restriping
  • Accessible spaces and signage
  • Fire lanes and curbs
  • EV space marking

Concrete

  • Sidewalk panel replacement
  • Curb and gutter
  • Trip-hazard grinding
  • Dumpster pads

Drainage

  • Regrading
  • Inlet and structure repair
  • Yard drains and downspout tie-ins
  • Erosion control

Fencing and enclosures

  • Perimeter fence replacement
  • Dumpster enclosures
  • Gates and pool fencing
  • Repairs

Site lighting

  • Pole and walkway LED retrofits
  • Photocells and timers
  • Building-mounted lights
  • Wiring repairs

How a site project runs

Select a stage to see what happens, what the board does and what residents notice.

Site survey

What happens

We walk the lots and sidewalks, mark trip hazards and drainage problems and photograph everything on a site plan.

The board's part

Shares the reserve study and any past paving work.

What residents notice

Our team on foot around the property for a few hours.

Report and options

What happens

Options such as crack seal and sealcoat versus mill and overlay, priced by lot section.

The board's part

Chooses the options against reserves. We present at a board meeting on request.

What residents notice

Nothing yet.

Approval and parking plan

What happens

Contract, permits where required, section-by-section schedule and a parking plan with management.

The board's part

Approves the scope, sections and dates. Management confirms parking and towing rules.

What residents notice

Written notice two weeks before work starts, with the section map and dates.

Phased work

What happens

One section at a time: repairs, paving or sealcoat, cure time, then striping before the section reopens.

The board's part

Daily status during paving days. Unexpected base failures documented and approved before repair.

What residents notice

Their section is closed for the posted days only; signs and cones mark every change.

Closeout

What happens

Walkthrough, punch list, warranty and photos of the finished site.

The board's part

Signs off on completion and receives the closeout file.

What residents notice

A final notice that all sections are open.

Questions boards ask

Where will residents park while you work?

We split the lot into sections and agree a parking plan with management before any work starts. Only one section is closed at a time.

How soon can cars drive on new sealcoat or asphalt?

It depends on the product and the weather. We post the reopening time on site and in the resident notice.

Sealcoat or repave?

Sealcoat protects pavement that is still sound. Once cracks reach the base or potholes repeat, a mill and overlay or full-depth repair is the better value. The survey shows which areas need which.

Do you restripe accessible and EV spaces?

Yes. Restriping includes the full layout: stalls, accessible spaces and signage, fire lanes and EV spaces.

Can you replace fencing at the same time?

Yes. Fencing, sidewalks and lighting are often bundled with paving so residents deal with one project instead of three.