
Faded striping
Stalls, fire lanes and accessible spaces residents cannot see are a safety and enforcement problem.
Commercial · Condominiums · HOAs · Apartments
Parking lots, sidewalks, striping, drainage, fencing and lighting: the grounds residents and visitors use every day. We plan every phase around cars and foot traffic so the community stays open.
Request a site surveyPhotos and marked-up site plan
Agreed with management in advance
Never the whole lot at once
Minimum, on commercial workmanship
Site problems get worse fast once water gets in. These are the conditions we map on a survey.

Stalls, fire lanes and accessible spaces residents cannot see are a safety and enforcement problem.

Open cracks let water into the base. Seal them early and you avoid rebuilding the lot.

Raised and broken sidewalk panels are one of the most common liability claims for associations.

Puddles that stay for days point to failed drainage or settled pavement.
Take the assembly apart layer by layer. Select a layer to see what it does and what we check on a survey.
Drag the handle to compare.
BeforeAfter
Select a stage to see what happens, what the board does and what residents notice.
We walk the lots and sidewalks, mark trip hazards and drainage problems and photograph everything on a site plan.
Shares the reserve study and any past paving work.
Our team on foot around the property for a few hours.
Options such as crack seal and sealcoat versus mill and overlay, priced by lot section.
Chooses the options against reserves. We present at a board meeting on request.
Nothing yet.
Contract, permits where required, section-by-section schedule and a parking plan with management.
Approves the scope, sections and dates. Management confirms parking and towing rules.
Written notice two weeks before work starts, with the section map and dates.
One section at a time: repairs, paving or sealcoat, cure time, then striping before the section reopens.
Daily status during paving days. Unexpected base failures documented and approved before repair.
Their section is closed for the posted days only; signs and cones mark every change.
Walkthrough, punch list, warranty and photos of the finished site.
Signs off on completion and receives the closeout file.
A final notice that all sections are open.
We split the lot into sections and agree a parking plan with management before any work starts. Only one section is closed at a time.
It depends on the product and the weather. We post the reopening time on site and in the resident notice.
Sealcoat protects pavement that is still sound. Once cracks reach the base or potholes repeat, a mill and overlay or full-depth repair is the better value. The survey shows which areas need which.
Yes. Restriping includes the full layout: stalls, accessible spaces and signage, fire lanes and EV spaces.
Yes. Fencing, sidewalks and lighting are often bundled with paving so residents deal with one project instead of three.
Tell us about the lots and walkways in scope. We map what we find and give the board a written report with options and a parking plan.
Thank you. We received your request and will reply within one business day.