Curling and granule loss
Shingles that cup, crack or shed granules into the gutters are losing their protection.
Commercial · Condominiums · HOAs · Apartments
Low-slope membrane roofs for commercial and mid-rise buildings, shingle roofs for garden-style and townhome communities. We survey, phase and replace roofs building by building, with protection for landscaping, cars and residents below.
Request a roof surveyPhotos of every roof in scope
Matched to your reserve study
No roof left open overnight
Minimum, on commercial workmanship
Roofs rarely fail all at once. These are the signs we document on a survey, roof by roof.

Shingles that cup, crack or shed granules into the gutters are losing their protection.

Water that stands for days after rain ages the membrane and finds every weak seam.

Most roof leaks start where the roof meets a wall, chimney, vent or skylight.

Stains on top-floor ceilings after storms point to the roof, even when it looks fine from the ground.
Take the assembly apart layer by layer. Select a layer to see what it does and what we check on a survey.
Drag the handle to compare.
BeforeAfter
Select a stage to see what happens, what the board does and what residents notice.
We inspect each roof in scope, photograph problem areas and note decking, flashing and drainage issues.
Grants access and shares the reserve study and leak history.
A short visit from our team. Access to top-floor units only where a leak is reported.
A report by building with repair or replace recommendations and line-item prices, including a unit price for deck repairs.
Reviews the options against reserves. We present at a board meeting on request.
Nothing yet.
Contract, permits where required, material orders, dumpster and parking plan.
Approves the scope and phasing. Management confirms dumpster locations and parking.
Written notice two weeks before work starts, from us, management or both.
One building at a time. We remove only what can be dried in the same day, replace soft deck, install the new roof and clean up daily.
Photos of any deck replacement, approved by change order. Weekly photo updates.
Noise during tear-off on work days. Cars moved away from the work zone; daily clean-up of the grounds.
Final inspection, punch list, workmanship warranty and the photo record.
Signs off on completion and receives the closeout file.
A final notice that work is complete.
No. Expect noise during tear-off on work days, and cars may need to move away from the building being worked on.
We photograph it and replace it at the unit price in the proposal, approved by the board through a change order. You know the price before the work starts.
We only remove as much roof as we can dry in the same day, and we watch the forecast. Open areas are protected before the crew leaves.
Yes. Most communities phase roofs over several budget years to match the reserve study.
It depends on the condition of the membrane and the insulation below it. The survey tells you whether a restoration is realistic or the roof needs replacement.
Tell us how many buildings and roofs are in scope. We inspect them, document what we find and give the board a written report with options.
Thank you. We received your request and will reply within one business day.