Stains and streaks
Dark streaks under windows and trim usually mean water is getting behind the cladding.
Commercial · Condominiums · HOAs · Apartments
Siding, masonry, sealants, waterproofing and balconies: the exterior systems that keep water out of the structure. We survey, plan and replace them building by building while residents stay at home.
Request a condition surveyPhotos and findings for the board
Matched to your reserve study
Two weeks before work starts
Minimum, on commercial workmanship
Most envelope failures start small and stay hidden until they reach the interior. These are the conditions we look for on a survey.

Dark streaks under windows and trim usually mean water is getting behind the cladding.

Spongy decks, cracked coatings and loose railings point to water in the structure.

Cracked mortar and split sealant joints let water into the wall with every storm.

Repeat leak calls from the same stack are a sign of an envelope problem, not a plumbing one.
Take the assembly apart layer by layer. Select a layer to see what it does and what we check on a survey.
Drag the handle to compare.
BeforeAfter
Select a stage to see what happens, what the board does and what residents notice.
We walk every building, open suspect areas where needed and photograph what we find.
Grants access and shares the reserve study and any past reports.
A short visit from our team around the buildings. No interior access unless a leak is reported.
A written report with photos, priorities and two or three scope options priced line by line.
Reviews the options against reserves. We present at a board meeting on request.
Nothing yet.
Contract, permits where required, material orders and a building-by-building schedule.
Approves the scope and the phasing. Management signs off on access and parking plans.
Written notice two weeks before work starts, from us, management or both.
One building or section at a time: protection, removal, repairs to what we uncover, new assembly, clean-up.
Weekly photo updates. Hidden conditions are documented and approved by change order before work continues.
Scaffolding or lifts outside for a defined period, daily clean-up.
Joint walkthrough, punch list, warranty documents and the full photo record.
Signs off on completion and receives the closeout file for the association records.
A final notice that work is complete.
Yes. Envelope work is done from the outside. We schedule building by building and residents get written notice two weeks before work starts. Interior access is only needed where a leak has already reached a unit.
We stop, photograph it and send the board a change order with the price before we repair it. Hidden conditions are never added to the bill without approval.
We read the reserve study first and price the scope in phases that match its timeline and funding, so the board can choose what to do now and what to plan for later.
Both. The condition report separates what can be repaired from what has reached the end of its life, so the board pays for replacement only where it is needed.
Yes. When the association has an engineer, we build to their specifications and coordinate inspections with them.
Tell us about the community. We walk the buildings, document what we find and give the board a written report with options.